
Solar Energy · 2025
Commercial Rooftop Solar
A 150 kWp array on a factory roof, targeting the daytime peak where consumption is highest.
This factory draws most of its power between 9am and 5pm, which is exactly when a solar array produces. The system was therefore sized against the daytime load rather than total annual consumption. The steel roof structure was checked before installation and reinforced at several bays, and real-time production monitoring was installed.
Project details
- Solar Energy
- สมุทรปราการ
- 2025
- 1,200 sqm
- 3 months