Air Conditioning · 2022

Factory HVAC Upgrade

Replacing an energy-hungry system and rebalancing airflow across the building.

The existing system was overworked because airflow had never been rebalanced after the building was extended. We measured flow zone by zone, then replaced plant and resized ducts only where the measurements showed it was needed, rather than stripping the whole system out. That kept both cost and downtime under control.

Project details

Category
Air Conditioning
Location
ชลบุรี
Year
2022
Floor area
850 sqm
Duration
4 months